Retrotec DucTester 200 series with DM32 Manuale Utente Pagina 3

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 8
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 2
Go to Home screen on gauge.
Adjust fan speed knob clockwise
until [Channel A] reaches test pressure.
If not possible, go to Step
5 for advice on changing setup.
Connect Speed Control Cable to fan.
For a test pressure of
25 Pa
*, tap
Enter 25, tap [Set]
Tap
to display what the
result would be at
exactly 25 Pa
*.
Page 3 of 8
Step 3: Connect gauge & fan
Insert blue tube into the
supply register closest to
the air handler.
Read results directly from the gauge.
Speed Control Cable
Connect power cord.
Switch to on: “ l . Green
light indicates that power
is connected.
Connect yellow and green
tubes to matching color
ports on fan. Ethernet
style Speed Control Cable
will disable the knob. It is
connected later in Step 4.
If Pressurizing, see tubing setup on page 7.
Connect Flex Duct to fan inlet for depressurization.
Ready to conduct the test by depressurizing the ducts:
Depressurization is easiest and permitted in all States
except CA & WA where it can still be used to
evaluate, but not for a final result.
Step 2: Connect to ducts (cont’d)
Total Duct Leakage Test: Depressurize
Step 4: Conduct test
To pressurize, connect the Flex Duct to fan exhaust.
All other connections remain the same
pressurize
Inlet
airow
Exhaust
Inlet
with Range Rings
inside Flex Duct
Exhaust
depressurize
Solid green Status light
indicates gauge is ready to
control speed.
airow
Depressurizing works best because the fan pulls the
Grill Mask tight on the registers during the test.
* 50 Pa for Northwest ENERGY STAR.
620.2
620.2
Vedere la pagina 2
1 2 3 4 5 6 7 8

Commenti su questo manuale

Nessun commento